Projects

Our work is undertaken in line with best industry practice and quality management principles, maintaining a robust system of checklists and work procedures which are adhered to from the project planning stage and throughout until project completion.

 

We pride ourselves with the ease of which we work with our clients and all site personnel – all our work is delivered smoothly and without fuss through our In-House work force.

BAYSWATER WAVES LEISURE CENTER

CITY OF BAYSWATER

July ’21 – January 22' | Project Cost $2.5m

July ’23 – January 24' | Project Cost $7-10m

 

The Bayswater Waves Aquatic Facility, situated at 160 Broun Avenue, Embleton, is the primary
aquatic facility for the City of Bayswater.

MORE INFORMATION

a98115ca-3ff6-437a-881a-8a33730ad0b1.JPG

BEATTY PARK LEISURE CENTER, CITY OF VINCENT

CITY OF VINCENT

Works for ALL CLASS TILING (sister company)

Project 1 |  Completion July  21, Project $1m

​Project 2 | 2024, $75K-$1m

Main Contractor to retile the combined 25m Pool and Leisure Pool after removal of existing surfaces back to structure. FW riser, CJs rebuilt, reseal gutters after sandblasting, correct defects in balance tank including roof, de-rust and recoat.

MORE INFORMATION

PC - LAND - BEATTY 1.jpg

GINO'S COFFEE SHOP

CITY OF FREMANTLE

May 24' | Project Cost $50k -300k

 

The City of Fremantle owns and manages the Eavn Davies building which has Ginos Coffee shop as a tenant. The pavement awning steel support works are showing signs of surface rust and require rectification and repainting in original colours. The external walls and doors of Gino’s are also in need of scraping and repainting in original colours.
The works will need to be performed following consultation with Ginos management regarding the timing of the works and any phasing required. It is envisaged that the works will be completed during May 2024 Monday - Thursday

MORE INFORMATION

IMG_2856.JPEG

SANTA MARIA COLLEGE

SANTA MARIA COLLEGE

January 24' | Project Cost $0.1-$0.35mm

 

Refurbishment Pools Full Building Refurbishment including full service demolition to completion on site.​

MORE INFORMATION

IMG_9705.JPG

RAVENSTHORPE DHS

SANTA MARIA COLLEGE

January 21' | Project Cost $50k - 300k

 

Remediation Works For Department Of Education School Pools To Achieve
Compliant Equipotential Bonding & Installation Of Eye Wash/Dump Shower.

MORE INFORMATION

9f217e63-2958-41e8-b4d1-de3618523200.JPG

LEISURE WORLD THORNLIE

CITY OF GOSNELLS

January 24' | Project Cost $250k -500kmm

 

Refurbishment of spa & sauna area.

MORE INFORMATION

IMG_0365.JPG

LESCHENAULT LEISURE CENTRE INDOOR 25M POOL TILING

SHIRE OF HARVEY

November ’22 – March ‘23

Project Cost: $0.5m

 

The renovation & upgrade of 25mtr lap pool for Shire of Harvey works included assessment and staging of works through to final completion handed over on site late March 2023. We worked closely with our sister company to ensure tiling of pool was to the highest of standards.​

MORE INFORMATION

ca119e19-0802-4298-a39c-dcce5e76b25a.JPG

KENWICK SCHOOL HYDROTHERAPY POOL TILE REPLACEMENT PROJECT

PROGRAMMED FACILITY MANAGEMENT

December ’22 – January ’23 (School Holiday Period)

Project Cost: $0.15m

 

The renovation & upgrade of the Hydrotherapy Pool at Kenwick School for Programmed Facility Management was fully completed during the School Christmas Holiday period of December 2022. We worked closely with our sister company to ensure tiling of pool was to the highest of standards.

MORE INFORMATION

a9f2ebb7-6d93-433a-8155-754f04ff26a7.JPG

SOUTH HEDLAND AQUATICS CENTRE, POOL LINER REMEDIATION

April ’23 – May ‘23

Project Cost: $0.4m

 

The renovation works at South Hedland Aquatic Centre for The Town of Port Hedland works included assessment and staging of works through to final completion handed over on site mid-May 2023.

MORE INFORMATION

08deef79-cf20-489a-a84f-c5da189c47ca.JPG

VENUESWEST, HBF JOONDALUP - CONCRETE INVESTIGATIONS & TESTING

November ’22 – December ‘22

Project Cost: <$0.1m

 

Condition reporting and investigation works for Venueswest @ HBF Joondalup Leisure Pool. This work included the following: 

MORE INFORMATION

Blank Paper_edited.jpg

HYDROTHERAPY POOL REMEDIATION PROGRAM

PROGRAMMED FACILITY MANAGEMENT 

Ongoing Works

Project Cost Varies

Hydrotherapy Pool Remediation Program maintenance across various institutional school sites. Maintenance and repairs to ensure current AS/NZS 3000:2018 standards are maintained. Works done to accommodate school programs & sensitivities.

MORE INFORMATION

PC - PORT - PFM Castlereagh 1.jpg

NEWMAN AQUATIC CENTER

HYDRILLA PTY LTD

Completion March 22'

Project Cost Varies

Work Description: Remove Existing Layer of Drummy Render Material back to Concrete Structure, Scabble Structure, Treat Exposed Reinforcement, Drill and Epoxy Fix Dowel Reinforcement Bars as Per Engineering Detail, Earth Bond Reinforcement, Form-Up, Place and Finish Concrete.

MORE INFORMATION

PC - PORTRAIT - NAC 3.jpg