VENUESWEST, HBF JOONDALUP
Concrete Investigations & Testing
November ’22 – December ‘22
Project Cost: <$0.1m
​Condition reporting and investigation works for Venueswest @ HBF Joondalup Leisure Pool. This work included the following:
![]() | ![]() | ![]() | ![]() |
---|---|---|---|
![]() | ![]() | ![]() | ![]() |
![]() | ![]() |
DESCRIPTION OF WORKS
-
Ground Penetrating Radar (GPR) concrete scanning to the Leisure Pool floor and marking-up of the problem areas e.g. drummy concrete, honey combing, delamination below the surface of the pool, reinforcement location, voids under floor.
-
Schmidt hammer tests to obtain concrete strength and various size concrete cores to be used for chloride and carbonisation levels and for residual life and current deterioration of reinforcement.
-
Cover meter check and mapping of reinforcement location to pool, walls and gutters.