SOUTH HEDLAND AQUATICS CENTRE , POOL LINER REMEDIATION

Apr ’23 – May ‘23

Project Cost: $0.4m

 

The renovation works at South Hedland Aquatic Centre for The Town of Port Hedland works included assessment and staging of works through to final completion handed over on site mid-May 2023.

 

DESCRIPTION OF WORKS

Separable Portion 1: Leisure Pool Floor Vinyl Liner Replacement 

  • Cut out, removal and disposal of existing damaged pool floor liner 

  • Supply and installation of new pool floor membrane liner (Renolit)

  • Earthing and equipotential bonding and as per Myrtha and industry standard 

 

Separable Portion 2: 50m Pool Gutter Tile 

  • Removal of existing structural ceramic inside face pool tile 

  • Repair of any damaged areas of PVC panel membrane damage during removal 

  • Clean-up of removed tiling, removal of silicon and adhesives from tiles to allow reuse 

  • Re-lay of existing structural ceramic gutter tile with materials and methodology compliant as per ‘Code of Practice for the Design, Construction, Operation, Management & Maintenance of Aquatic Facilities.’ 

 

Separable Portion 3: Additional Lane Rope Anchors (50m pool). 

  • Supply and Installation of 6 x additional lane rope anchors, both gutter and wall 

  • Earthing and equipotential bonding and as per Myrtha and industry standard