SOUTH HEDLAND AQUATICS CENTRE , POOL LINER REMEDIATION
Apr ’23 – May ‘23
Project Cost: $0.4m
The renovation works at South Hedland Aquatic Centre for The Town of Port Hedland works included assessment and staging of works through to final completion handed over on site mid-May 2023.
DESCRIPTION OF WORKS
Separable Portion 1: Leisure Pool Floor Vinyl Liner Replacement
-
Cut out, removal and disposal of existing damaged pool floor liner
-
Supply and installation of new pool floor membrane liner (Renolit)
-
Earthing and equipotential bonding and as per Myrtha and industry standard
Separable Portion 2: 50m Pool Gutter Tile
-
Removal of existing structural ceramic inside face pool tile
-
Repair of any damaged areas of PVC panel membrane damage during removal
-
Clean-up of removed tiling, removal of silicon and adhesives from tiles to allow reuse
-
Re-lay of existing structural ceramic gutter tile with materials and methodology compliant as per ‘Code of Practice for the Design, Construction, Operation, Management & Maintenance of Aquatic Facilities.’
Separable Portion 3: Additional Lane Rope Anchors (50m pool).
-
Supply and Installation of 6 x additional lane rope anchors, both gutter and wall
-
Earthing and equipotential bonding and as per Myrtha and industry standard